PELAKSANAAN GANTI KERUGIAN DALAM KEGIATAN PENGADAAN TANAH BAGI PEMBANGUNAN UNTUK KEPENTINGAN UMUM RUAS JALAN TOL SOLO-YOGYAKARTA DI KABUPATEN KARANGANYAR

Authors

  • DITANIA PUJI HASTUTI

Abstract

Purpose The purpose of this research is to find out and analyze the process
of implementing compensation and what obstacles are faced in land acquisition
activities for the development of the Solo-Yogyakarta toll road section in
Karanganyar Regency.
The background of this study is to determine the stages of implementing
compensation for land procurement for development for the public interest of the
Solo-Yogyakarta Toll Road in the Karanganyar Regency and to find out the
obstacles faced in the implementation of compensation payments.
This type of research uses a sociological juridical approach. Based on its
nature, this research uses a type of research based on qualitative data. As for the
determination of the sample used in qualitative research, the technique is purposive
sampling, and snowball sampling. The data collection method used is the document
study method and the interview method . Data analysis using descriptive analysis
method to get clear and definite conclusions and can be accounted for in theory and
practice.
From the research results: (1) it is known that the implementation of land
acquisition is carried out through the following stages: (a) Planning; (b)
Preparation; (c) Implementation; (d) Submission of Results; while for the
compensation payment process through the stages of the Direct Payment
mechanism, Land Procurement for National Strategic Projects, as follows: (a) P2T
issues validation; (b) the Minister/Head submits a request for payment to LMAN;
(c) LMAN conducts administrative research; (d) LMAN, confirms the Payment
Approval or Return of the Application to complete the documents; (e)
Implementation of Direct Payments to entitled Parties; (f) Submission of Direct
Payment Reports to LMAN; (g) PPK for Land Procurement conducts data
suitability testing; (h) PPK for Land Acquisition submits SPP-GK to PPSPM; (i)
PPSPM conducts SPP-GK conformity testing; (j) PPSPM submits SPP-GK to the
Minister/Head; (k) The Minister/Head submits a payment request to LMAN. (2) In
this study, there were obstacles encountered, one of which was related to the
implementation of compensation payments for village treasury land in the
Karanganyar Regency although it was carried out in accordance with the provisions
of the applicable laws and regulations, it still took a long time. This is a fundamental
obstacle to be overcome immediately.
Keywords: Compensation, Land Acquisition, Toll Road.

PlumX Metrics

Published

2023-01-26