PENERAPAN METODE CPM DAN GRANTT CHART UNTUK MENGUKUR EFISIENSI WAKTU (Studi Kasus Pembangunan Rumah Perum GIP Kertosono, Nganjuk)

Authors

  • Rony Kurniawan Universitas Nusantara PGRI Kediri

DOI:

https://doi.org/10.33061/jeku.v20i4.4997

Keywords:

CPM method, Grantt Chart and Time Efficiency

Abstract

The implementation of housing unit construction needs to be done in order to control time efficiently. Therefore, the delay of the house will result in inefficient costs. This study aims (1) to determine the scheduling sequence of the type 45/90 residential development project at Perum GIP Kertosono, Nganjuk (2) to determine the network or network in the type 45/90 residential development project at Perum GIP Kertosono, Nganjuk (3) To understand] the critical activities carried out in the housing construction project type 45/90 at Perum GIP Kertosono, Nganjuk, (4) To find out the activities carried out jointly in the housing construction project type 45/90 Perum GIP Kertosono, Nganjuk. This research uses the Critical Path Method (CPM) or the critical path and the Grantt Chart method. The application of the CPM method is used to determine the time for effective and efficient development projects. While the grantt chart method is used to determine the activities carried out and the busiest time in the housing development project activities. Through the application of CPM resulted in efficient development implementation with a time of 84 days or 19 days faster than the total time predicted by the planning team for 103 working days. Through the grant chart method, it was found that the busiest times of construction were on the 16th to the 53rd day because at that time it was carried out simultaneously with the installation of sloofs, concrete columns, installation of floor tiles and construction of terraces.

References

Aulady, M. F. N., dan Orleans, C. 2016. Perbandingan Durasi Waktu Proyek Konstruksi Antara Metode Critical Path Method (CPM) dengan Metode Critical Chain Project Management (Studi Kasus: Proyek Pembangunan Apartamen Menara Rungkut). Jurnal IPTEK, 20(1), 13-24.

Dipoprasetyo, I. 2016. Analisis Network Planning dengan Critical Path Method (CPM) dalam Usaha Efisiensi Waktu Produksi Pakaian Batik pada Butik “Omahkoe Batik” di Samarinda. Ejournal Administrasi Bisnis, 1, 1002-1015. Ginanjar, A. 2017. Optimasi Waktu Penyelesaian Pesanan Khusus Produksi Gitar Accoustic pada CV. Butanza Banyuwangi dengan Kombinasi Metode Pert dan CPM. Ilwaru, V. Y. I., Rahakbauw, D. L., dan Tetimelay, J. 2018. Penjadwalan Waktu Proyek Pembangunan Rumah Dengan Menggunakan Cpm (Critical Path Method). BAREKENG: Jurnal Ilmu Matematika dan Terapan, 12 (2), 61-68. Islamy, K. Y. 2013. Proses Produksi Body Galon (5 kg) Cat Jenis Envitex Dengan Metode Network Pada Indaplas-Pt. Indaco Coatings Industry Kebakkramat Karanganyar. Julkarnaen, T. I., Herlina, L., dan Kulsum, K. 2015. Analisa Perbaikan Penjadwalan Perakitan Panel Listrik Dengan Metode CPM dan PERT (Studi Kasus: PT. Mega Karya Engineering). Jurnal Teknik Industri Untirta, 3 (1).

Downloads

PlumX Metrics

Published

2021-01-21